A&D OP-11 Manual de instalación Pagina 88

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 182
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 87
2 Operating A&D DataManagement 07/2011
2.5 HD component
© Siemens AG 2011 All Rights Reserved
2-88 SIMATIC A&D DataManagement Client - 07/2011
Properties of the HD component
Backing up or loading an HD component via the network consists of several
indexing steps.
In this section all of the indexing steps are described in detail.
Connecting the computers
If the two computers are not already connected in a shared network (workgroup or
domain), the computers are connected as follows:
Without hub via a direct twisted pair cable.
With hub via two patch cables
1. Then, under Start Settings System control Network
Identification, ensure that the ADDM computer does not log on to a domain
after booting.
2. Assign the ADDM computer to a workgroup with the "Modify...” button.
Vista de pagina 87
1 2 ... 83 84 85 86 87 88 89 90 91 92 93 ... 181 182

Comentarios a estos manuales

Sin comentarios