A&D OP-11 Manual de instalación Pagina 48

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 182
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 47
2 Operating A&D DataManagement 07/2011
2.4 Specifying the properties of the control components
© Siemens AG 2011 All Rights Reserved
2-48 SIMATIC A&D DataManagement Client - 07/2011
"Transfer AS link data" option.
If FDL links have been configured; these are also transferred when the S7
CPU is being loaded. This option can only be activated in V2 STEP7
projects. In V3 STEP7 projects, this information is transferred together with
the AS configuration (SDB).
The link data are also loaded with the transfer to the CP342-5 component.
"Start target module after editing" option.
You should always activate this option, so that ADDM automatically starts
the CPU after the transfer.
"RAM to ROM after transfer"option.
ADDM automatically stores the data here in the case of modules with
integrated FLASH.
With the setting "Routing via agent” the CPU will be contacted via an
installed ADDM Agent on an operator panel. For this function the name or
the TCP/IP address of the Agent computer has to be declared.
The "CPU Password” setting stores the password for access to password-
protected CPUs.
The date and time are stored if the transfer is successful.
You create a reference to an S7 project with the "S7 program" button.
You store the S7 project itself in a directory (e.g. S7_projects) on the same
drive as the ADDM project.
Notice
A reference (pointer) to an S7 project must not be made from various ADDM
projects. Failure to observe this requirement may lead to loss of data in
connection with the Copy part projects and Archive functions.
Vista de pagina 47
1 2 ... 43 44 45 46 47 48 49 50 51 52 53 ... 181 182

Comentarios a estos manuales

Sin comentarios